(321) 220-3911
Serving Brevard County, Florida
Brevard Bathroom Remodeling Free Estimate

Tub-to-Shower Conversions in Brevard County

Replacing a tub with a walk-in shower is among the most common bathroom projects, often driven by accessibility or a wish for a larger shower. This page explains how the conversion works, which parts need licensed trades and what to ask about waterproofing, curbs and resale.

Get My Free Estimate

Free estimate, no obligation. Takes about a minute.

How a conversion works

Keeping the drain where it is limits slab work and cost. Ask the contractor what the existing plumbing allows.

  • The tub, surround and flooring around it are removed.
  • The drain is adapted or moved, and the floor is prepared.
  • A pan or membrane waterproofs the base and walls.
  • Tile or panels are installed over the waterproofing.
  • Glass, fixtures and trim finish the shower.

Curb height and entry

A standard shower has a raised edge, a low-curb shower has a small dam and a curbless shower has none and slopes to the drain. Curbless designs are easy to enter but need a more careful floor and waterproofing. Ask which suits your floor and who in the household will use it.

Waterproofing and testing

The shower pan and wall system are the heart of the job. Ask which system the contractor uses, how seams and corners are treated and whether the pan is flood-tested before tile. A written description and photos at each stage create a record.

Permits and considerations

Moving drains or changing walls usually needs a permit. If the tub is the home’s only tub, consider how the change affects future buyers and household members. Ask your local building office whether your scope requires a permit.

What the proposal should say

Ask for the proposal to describe the stages in order, so that you know what is being inspected, what is covered up and when the shower can be used again.

  • How the drain will be handled and whether the floor is opened.
  • Which waterproofing system is used, and how it is tested.
  • What curb or entry is planned, with dimensions.
  • Who supplies and installs the glass, and when it is measured.

What a bathroom estimate should list: tub-to-shower conversion

Ask for demolition, waterproofing, tile, plumbing, electrical and glass priced as separate lines for tub-to-shower conversion, so two bids are comparing the same room. How bathroom estimates work. Ask how long the room will be out of use, who coordinates the plumber, electrician and tile setter, and what happens to the schedule if the demolition uncovers rot or outdated pipes. Written answers to those three questions explain more about a bid than its total does.

From first call to a finished bathroom

  1. Walk the room with the contractor and agree what stays, moves or goes.
  2. Compare itemized written proposals, including plumbing, electrical, tile and glass.
  3. Choose fixtures and tile early, since lead times often set the schedule.
  4. Confirm permits and inspections for any plumbing or electrical changes.
  5. Walk the finished room, test the fixtures and keep warranty and permit papers.

Vet the contractor first

Look the contractor up on the state DBPR license search before a deposit changes hands for tub-to-shower conversion, and ask for a current certificate of insurance. Ask which licensed plumber and electrician will handle those parts, and how the shower will be waterproofed. The rest of the vetting list is on the checking-a-pro page. If the bid includes a shower or tub, ask how the waterproofing will be done and tested before tile goes up. A written description of the waterproofing method is a reasonable request.

Bathroom remodel questions, answered

Is a tub-to-shower conversion worth it?

It makes sense when nobody uses the tub, you want a lower step-in or accessibility matters. Keeping the drain where it is limits slab work. If it is the home’s only tub, consider how you will use the space later.

What is the difference between curbless and low-curb?

A curbless shower has no raised edge and the floor slopes to the drain, which often means recessing the floor and a bigger waterproofing detail. A low-curb shower keeps a small dam, which is simpler to build and still easy to step over.

Does a conversion need a permit?

Often. Florida requires a permit to alter or repair a building, with limited exemptions, and moving plumbing or changing walls usually triggers one. Ask your city or the county whether your scope is covered. Say whether the drain will move when you ask.

How long does a conversion take?

It depends on permit review, inspections, waterproofing cure time and the lead time of glass and tile. Ask for a written schedule that separates each stage and shows when the shower becomes usable. Ask when the glass is measured and ordered.

More bathroom work like tub-to-shower conversion

Homeowners ask about this in: bathroom remodeling in Titusville, bathroom remodeling in Satellite Beach, bathroom remodeling in Merritt Island. Planning read:Planning a bathroom remodel budget in Brevard.

References:Florida Statutes 553.79 (permits and exemptions) (accessed Nov 2026); Florida Statutes 489.113 (contractor scope and subcontracting) (accessed Nov 2026). General information, not legal advice; confirm with the office that covers your address.

Page updated November 2026.

Planning a bathroom remodel?

Describe the room in the short form and an independent local remodeler will reach out to schedule a free walk-through.

Get My Free Estimate (321) 220-3911

Get My Free Estimate