When a Brevard bathroom remodel needs a permit
Whether a bathroom remodel needs a permit depends on what changes, and on which building office covers your address. This guide explains the Florida rule, the common triggers, who issues permits in Brevard County and its cities, and what to ask your contractor to put in writing.
The Florida rule in plain terms
Florida’s building code statute requires a permit to construct, erect, alter, modify, repair or demolish a building, with a short list of exemptions. For a bathroom, that means a remodel that changes the structure or the plumbing and electrical systems is generally a permitted project, while purely cosmetic work usually is not.
The statute is the starting point, but the building office has the final say on how it applies to your scope. Ask before work starts, and ask for the answer in writing.
Common triggers
Same-location fixture swaps, painting and floor coverings are the kind of work that may not need a permit, but the contractor should still confirm with the building office.
- Moving or adding drains, vents or supply lines.
- Adding circuits, moving outlets or switches, or adding a fan or heater circuit.
- Removing or moving walls, or changing a door or window opening.
- Replacing a water heater or changing gas or mechanical systems.
- Work that opens floors or the slab.
Who issues the permit
In unincorporated Brevard, the county’s Planning and Development department handles residential permits, including the Building and Site Services unit. Inside a city, the city’s own building department issues them: Palm Bay, Melbourne, Titusville, Cocoa, Rockledge and the beach cities each run their own offices.
If you are not sure whether your address is inside a city, check your property record or ask the county. Applying to the wrong office loses time.
Licensed trades and who pulls the permit
Under Florida’s contractor licensing law, a general, building or residential contractor must subcontract electrical, plumbing and mechanical work unless they hold the matching certificate or registration. The permit is normally pulled by the licensed contractor responsible for the job, and inspections are scheduled under that permit.
Be cautious if a contractor suggests that you pull the permit as an owner-builder. Owner-builder permits come with their own conditions and responsibilities, including personal liability, and they are not a shortcut.
Flood zones and the 50% rule
If your home is in a FEMA special flood hazard area, the local floodplain administrator may compare the cost of improvements to the market value of the building under the substantial improvement rule. A bathroom alone rarely reaches that level, but a bathroom as part of a larger project can. Ask the building office whether your address is in a flood zone.
What to ask the contractor to put in writing
State law also requires the contractor’s license number on proposals. Verify each number on the state’s DBPR license lookup before you sign.
- Who will pull the permit and in whose name.
- Which licensed trades will do plumbing and electrical, with license numbers.
- Who will schedule inspections and be on site for them.
- What happens if an inspection fails or reveals additional work.
- Whether permit fees are included in the proposal or billed separately.
Records to keep
Keep the permit card, inspection results, final approval and any product information. These documents matter when you sell, file an insurance claim or have a later project. Missing final approvals are a common problem in transactions. Ask the contractor for a copy of each and file them with your home records.
What a bathroom estimate should list
Ask for demolition, waterproofing, tile, plumbing, electrical and glass priced as separate lines for your project, so two bids are comparing the same room. How bathroom estimates work. Ask how long the room will be out of use, who coordinates the plumber, electrician and tile setter, and what happens to the schedule if the demolition uncovers rot or outdated pipes. Written answers to those three questions explain more about a bid than its total does.
From first call to a finished bathroom
- Walk the room with the contractor and agree what stays, moves or goes.
- Compare itemized written proposals, including plumbing, electrical, tile and glass.
- Choose fixtures and tile early, since lead times often set the schedule.
- Confirm permits and inspections for any plumbing or electrical changes.
- Walk the finished room, test the fixtures and keep warranty and permit papers.
Vet the contractor first
Look the contractor up on the state DBPR license search before a deposit changes hands for this kind of project, and ask for a current certificate of insurance. Ask which licensed plumber and electrician will handle those parts, and how the shower will be waterproofed. The rest of the vetting list is on the checking-a-pro page. If the bid includes a shower or tub, ask how the waterproofing will be done and tested before tile goes up. A written description of the waterproofing method is a reasonable request.
Bathroom remodel questions, answered
Does a bathroom remodel always need a permit?
No. Cosmetic work and same-location fixture swaps often do not, but moving plumbing, adding circuits, changing walls or windows usually does. Ask your local building office whether your scope needs one, and request the answer in writing. Save that answer with your records.
Who do I call in Brevard County?
In unincorporated areas, the county’s Planning and Development department. Inside a city, the city building department. Check your property record if you are not sure which applies, and confirm before you apply. The property record shows the taxing district, and a call to the department can confirm it.
Can I pull the permit myself?
Florida allows owner-builder permits for owner-occupied homes under conditions, but you take on legal responsibility for the work and the trades. Ask the building office what applies, and be wary of any contractor who asks you to pull it. Ask who will hold the permit before you sign.
What if work was done without a permit?
Unpermitted work can cause problems with insurance, resale and inspections. Contact the building office about how to resolve it, since options vary by jurisdiction. A licensed contractor can help document and correct the work. Ask the office before listing or refinancing, not after.
Bathroom projects this guide touches
References:Florida Statutes 553.79 (permits and exemptions) (accessed Nov 2026); Florida Statutes 489.113 (contractor scope and subcontracting) (accessed Nov 2026); Brevard County residential permits (BASS and owner-builder rules) (accessed Nov 2026); FEMA substantial improvement guidance (accessed Nov 2026). General information, not legal advice; confirm with the office that covers your address.
Guide reviewed November 2026.